Project: Chabahar Wastewater Treatment Plant – BOT
Client: Chabahar Free Zone Organization
Operation Period: 15 years
Consultant: Pars Jouyab
Capacity: 2000 m3/day
Method: MBBR


Project: Payam Airport Wastewater Treatment Package
Client: Payam Economic Free Zone
Consultant: Technical Office
Capacity: 400 m3/day
Method: MBBR



Project Name: Lykak Potable Water Plant
Client: kohgiluyeh Boyer Ahmad Authority
Contractor: Mana Water & Power Co.
Capacity: 1500 m3/day
Method: Reverse Osmosis
-
- Scope: RO Upgrade and Utilization
- Plant Restart & Making Potable Water
- Defective Parts & Units Overhauling
- Replacement
- Chemicals Supply




Project: Shiraz Rural Desalination Package
Client: Fars Rural Authority
Capacity: 30 m3/day – 3 units
Method: Reverse Osmosis System


Project: Behshahr Mehr Complex WWTP Package
Client: Mazandaran Authority
Capacity: 200 m3/day
Method: Extended Aeration

Project: Shahroud University Reuse Ultra-Filtration
Capacity: 60 m3/day
Method: Ultra-Filtration



Project: Shafaroud Dam Wastewater Treatment Package
Client: Zhian Company
Consultant: Mahab Qods Consulting Engineers
Capacity: 10 m3/day
Method: MBBR


Project: Ilam Hospital Wastewater treatment package
Client: Imam Khomeini Hospital – Ilam
Consultant: Technical Office
Capacity: 10 m3/day
Method: Anoxic – Oil Seprator

Project: Nahaja Hotel Ozonation Prefabricated Package
Client: Islamic republic of Iran Air force Army
Consultant: Technical Office
Capacity: 80 gr
Method: Arc System


Project: Rural Project Zone 3 – Financed by IDB
Client: Iran National Water & Wastewater Company
Consultant: Pars Peyab
Capacity: 11 villages
Method: Fixed Bed Package Unit
Scope:
- Biopak 700
- Biopak 1100
- Biopak 1500
- Biopak 1800

Project Name: South Pars – Phase 19 Package Units
Client: Petro Pars Iran
Operation Period: 2 years
Capacity: 2000 m3/day
Method: Extended Aeration



Project: South Tehran Waste-Water Treatment Module 5&6
Client: South Tehran Authority
Contractor: Zharfkar Jam
Consultant: Mahab Ghods
Capacity: 312.000 m3/day
Method: Extended Aeration – Digester Unit
Scope: Biogas Unit
- Condensate Pot – COP
- Gas Dryer
- Flame Arrestor



Project: Mashhad Waste-Water Treatment Plant – Alteimour
Main Client: Khorasan Authority
Contractor: Kayson
Consultant: Pars Ab Tadbir
Capacity: 80.000 m3/day
Method: Extended Aeration
Scope: Headworks
- 52 Gates
- 4 Primary Sedimentation
- 4 Secondary Sedimentation
- 1 Grit and Grease Removal
- 2 Thickener



Project: Ilam Olefin WWTP
Contractor: Shafab Engineering
Capacity: 800 m3/hour
Method: Hybrid cooling tower


Project: Gachsaran Olefin WWTP
Main Client: Gachsaran Petrochemical Comapny
Contractor: Shafab
Capacity: 5 m3/hour
Method: Screw Press


Project: Isfahan City Waste-Water Treatment Plants – 3 Units
Plants: Shahinshahr, North Isfahan, South Isfahan
Main Client: Isfahan Authority
Contractor: Absun Zolal
Capacity: 25m3/hour
Method: Extended Aeration
Scope: Sludge Dewatering System
- Sludge Dewatering Decanter
- Sludge Feeding Pumps
- Sludge Rotocut
- Disposal Screw


Project: NGL 3100
Main Client: OIEC Group
Capacity: 10 m3/hour
Method: Extended Aeration
Scope: Sludge Dewatering System
- Sludge Dewatering Decanter
- Sludge Feeding Pumps
- Sludge Rotocut
- Disposal Screw


Project: South Tehran WWTP – Module 5 & 6
Spare Parts and Rehabilitation
Main Client: Tehran Wastewater Authority
JV: Sazehaie Abi – Mana Water
Scope of Rehabilitation
- Screening system,
- Sludge Belt Filter Press
- Roots Blowers
- Instruments
- UV systems

Project: Siraf Methanol Plant- Plate Heat Exchanger Units
Main Client: Siraf Investment Company
Contractor: Pendar Industrial Solutions
Scope: Plate Heat Exchangers
- 10 Units



Project Name: Abadan Refinery Screening System
Main Client: Abadan Refinery
Contractor: Kian Payab
Scope:
- 6 set Band Screen
- 6 Set Coarse Screen


Project Name: Gachsaran Olefin WWTP
Main Client: Gachsaran Petrochemical Plant
Contractor: Shafab
Scope:
- DAF system
- Oil Skimmer
- Surface Aerator

Project Name: Birjand WWTP
Main Client: South Khorasan Water Authority
Contractor: Sazehaie Abi
Consultant: Mahab Ghods
Capacity: 21.500 m3/day
Scope:
- Screening systems
- Sedimentation Bridges
- Gates and Penstocks
- Grit Removal Bridges


Project: Ahwaz Waste-Water Treatment Plant
Client: Guilan Authority
Contractor: Mojan
Consultant: Pars Ab Tadbir
Capacity: 112.000 m3/day
Method: Extended Aeration
Scope: Screening System
- fine screen 3 units
- Sand Classifiers 2 units
- Grit and Grease Removal 1 unit
- Screw Conveyor
- Screening Washing


Project: Rural Zone 3 – Blowers
Client: Iran National Water & Wastewater Company
Consultant: Pars Peyab
Capacity: 8 villages
Method: Fixed Bed Package Unit
Scope:
- Side Channel Blower 32 unit

Project: Mashhad Waste-Water Treatment Plant – Alteimour
Client: Khorasan Authority
Contractor: Kayson
Consultant: Pars Ab Tadbir
Capacity: 75.000 m3/day
Method: Extended Aeration
Scope: Odur Removal System
- 3 Bio filter Unit


Project: Bonab Wastewater Treatment Plant
Client: East Azarbaijan Authority
Contractor: Abpardazan Bahar
Consultant: Pars Peyab
Capacity: 26.200 m3/day
Scope: Screening System
- Pump station coarse screen 2 units
- Fine screen 2 units


Project Name: East Anzali Waste-Water Treatment Plant
Main Client: Guilan Authority
Contractor: Kayson
Consultant: Iranaab
Capacity: 12.000 m3/day
Method: Extended Aeration
Scope: Aeration System
- 1100 Disc Diffuser
- 1100 Saddle & Clamps
- 16 Coarse Diffuser